Wow, time flies. Well, looks like my website exeded it's max monthly traffic allowance. That's not a bad thing forsure, but we're going to have to deal with that unfortunately since I can't afford to upgrade my hosting at the moment.
Well things have been slow but at least some progress. One of the local guys had a "fluid swap" day at his place, so everything but the coolant was changed, and man did they need to be changed. At the same time, I put in a rear diff breather, removing the factory capped vent with the Nissan 38323-C6010 fitting and used rubber tubing follow the factory lines to up being the tail light and into the body through one of the capped holes. Also after waiting for 2 months, I was finally able to get my heated seats pads in. They're installed in the seats and they're very straight forward to tie into Pathfinder/Maxima heated seat switches. So far they're just running on a cigarette lighter adapter, but when I get a chance, they'll be hard wired to a switched power source that runs with the remote starter. Unfortunately I broke my digital camera a few week ago by keeping it in my back pocket and sitting on it, but the replacement screen I got for it off of eBay for $30 should be in any day now. I also just got my A-pillar gauge pod in today as well. I've only got a boost gauge to go in there, and I need to pick up a volt gauge to put in the spot where the boost gauge was.
Tuesday, December 8, 2009
Subscribe to:
Post Comments (Atom)

No comments:
Post a Comment